Complete PCBA
production.

Material planning, SMT, mixed assembly, inspection, repair and packing are coordinated inside one compact workshop.

Built for prototypes, pilot builds and repeat quantities from one piece.

Inline transfer conveyor through the XTong production area
Inline transfer conveyor through the production area

1 pcMinimum order

1,000 m²Workshop

7+ daysFast sample start*

OEM / ODMCustom engagement

*After technical review and subject to component availability.

Built around the build.

The work is planned from the files out. Material choices, assembly method and test requirements are agreed before release.

Material planning

The BOM is checked against availability, approved alternatives and project timing. Long-lead parts are surfaced before a production date is committed.

Components organised in an SMT feeder cart at XTong
Components organised in an SMT feeder cart

SMT and mixed assembly

SMT, through-hole and manual operations follow the approved revision. Flexible quantities support one-off prototypes and repeat builds.

SMT equipment used for mixed-technology assembly
SMT and mixed assembly

Inspection and test

AOI, programming and fixture-based functional testing are included where the project requires them. Acceptance criteria are agreed before production.

Assembled control PCBA prepared for inspection at XTong
Assembled PCBA ready for inspection

Repair, packing and release

Rework can return to the agreed inspection or test step. Finished assemblies are packed and labelled against the approved revision and project requirements.

Production staging area with packed goods at XTong
Production staging and packed goods

Flexible where it matters.

The small team is set up for custom, changing and high-mix projects where a direct engineering conversation shortens the path to a clear answer.

  • Prototype, pilot and repeat production quantities
  • Customer-supplied components and approved sourcing routes
  • Programming, AOI, FCT, rework and repair where specified
  • Project-specific packing, labels and shipment records
  • Changes reviewed before a new revision is released
PCBA handling detail · Guangzhou workshop

Review the workshop.

Send the files and project requirements. The production route, long-lead parts and review points will be identified before scheduling.

Send Gerber/BOM