OEM / ODM
PCBA services.
Choose how much design, sourcing and production support your team needs. Every route starts with a technical review and ends with an agreed release plan.
MOQ 1 pc. Prototype samples from 7 days after technical review, subject to component availability.
Choose the engagement.
Both models can include material planning, assembly, testing, repair and shipment. The difference is how much of the design and sourcing package XTong owns.
| Project stage | OEM / build to files | ODM / design-led support |
|---|---|---|
| Starting point | Approved Gerber, BOM, CPL and assembly requirements. | Product or PCBA concept that still needs engineering definition. |
| Engineering scope | DFM review, build constraints, missing information and revision control. | Design support, component selection, prototype planning and design changes. |
| Production scope | Sourcing, SMT, through-hole, mixed assembly, testing and packing. | The same production route, coordinated with the evolving product definition. |
| Best fit | Teams with a released design and a defined supply chain. | Teams that need more engineering and sourcing involvement. |
Customer-supplied materials and approved alternatives can be included when the project requirements are clear.
One connected route.
The work moves through a defined route. Changes, long-lead parts and test requirements are raised before the next step is released.
- FilesEngineering review
- SourceBOM and material plan
- BuildSMT and mixed assembly
- AOI & TestInspection and FCT
- ShipPacking and records
Start with the build package.
The first review is faster when the design intent, order quantity and acceptance route are visible together. Missing information is listed before quoting.
- Gerber files and PCB revision
- BOM with approved alternatives
- Pick-and-place and assembly drawing
- Quantity, target date and delivery address
- Testing, programming and packaging requirements
- Any customer-supplied materials or existing stock
Engineering to production.
Real workshop views support the route without exposing customer project details.
Continue the build.
Send the first build package.
Include the Gerber, BOM, quantity and target date. XTong will identify what is missing before confirming a sample or production schedule.